Interactive demo
Click around a sample Spectr workspace.
A working copy of the app with sample data. Watch a meeting become stories, then take over: open any page from the sidebar, filter the review queue, and explore everything around it.
Stories
Add bulk export for meeting transcripts
3ptsfeatureP1As a PM, I want to export multiple transcripts as a ZIP so I can archive session records for quarterly reviews.
Fix pagination reset on filter change
1ptbugP0As a user, I want pagination to persist when I change filters so I don't lose my place during story review.
Rewrite the onboarding flow end to end
8ptsfeatureP3As a new user, I want a redesigned onboarding flow so I understand the product faster on first run.
Linear webhook bidirectional sync
3ptsfeatureP2As a PM, I want story statuses to update automatically when my team moves issues in Linear so both tools stay in sync.
Archive exports to the workspace storage bucket
5ptsfeatureP2As an admin, I want finished exports kept in our own bucket so quarterly archives outlive the export job.
Feature by feature
Every page, one at a time
Follow the meeting through to reviewed stories, then the surfaces around them: spec sheets, requirements, the delivery roadmap, scope creep, budget, team and the AI Assistant.
Every meeting, imported and read end to end.
Import from Fathom, Granola, Read.ai, or Fireflies in one click, paste a transcript, or upload a PDF or TXT file. Spectr stores the AI notes, action items, and transcript together, then reads the whole record - picking out each requirement it will turn into a story.
Q4 Planning Call
AI Notes
- Archiving is the blocker; Finance raised the same gap last quarter.
- Pagination resetting on a filter change is treated as a P0.
- Linear should sync both ways, so status moves are not re-entered.
- The onboarding rewrite is parked, out of scope this quarter.
Action Items
- Scope the ZIP export for a whole set of transcripts — Maya Chen
- Reproduce the pagination reset on filter change — Alex Kim
- Circulate the notes and confirm the sprint's three items — Jordan Lee
Transcript
Jordan Lee: Quarterly reviews are next month and archiving is still the blocker.Maya Chen: Right - we need bulk export for meeting transcripts, a whole set as one ZIP.requirementJordan Lee: Makes sense. Finance asked for the same thing last quarter.Maya Chen: Also flagging: pagination resets whenever I change a filter, so I lose my place mid-review.requirementAlex Kim: That's a P0, it's hitting the entire review flow.Jordan Lee: Last one: when the team moves an issue in Linear, Spectr should pick it up.requirementAlex Kim: Someone floated redoing onboarding. Parking that, it is not this quarter.
API Platform - Q4 Discovery Spec Sheet
Jun 26, 2026
API Platform - Product Requirements
Review-ready stories, one status at a time.
Every story arrives with a user-story body, acceptance criteria, priority, type, and an estimate, linked back to the meeting it came from. Approve or reject each one, filter by status, and push the approved set straight to your Linear team or Shortcut workspace.
Stories
Add bulk export for meeting transcripts
3ptsfeatureP1As a PM, I want to export multiple transcripts as a ZIP so I can archive session records for quarterly reviews.
Fix pagination reset on filter change
1ptbugP0As a user, I want pagination to persist when I change filters so I don't lose my place during story review.
Rewrite the onboarding flow end to end
8ptsfeatureP3As a new user, I want a redesigned onboarding flow so I understand the product faster on first run.
Linear webhook bidirectional sync
3ptsfeatureP2As a PM, I want story statuses to update automatically when my team moves issues in Linear so both tools stay in sync.
Archive exports to the workspace storage bucket
5ptsfeatureP2As an admin, I want finished exports kept in our own bucket so quarterly archives outlive the export job.
Every requirement, decision and action item - automatically structured.
Spectr reads the whole meeting and pulls out what matters: a summary, the decisions made, the action items and who owns them, and the tasks it turns into stories - each with how confident it is, all in one spec sheet.
API Platform - Q4 Discovery Spec Sheet
Maya Chen, Jordan Lee and Alex Kim set the sprint for API Platform. Quarterly archiving is the blocking workflow, so bulk export of meeting transcripts leads; the pagination reset on filter change is treated as a P0; and Linear should stay in sync both ways. Redoing onboarding came up again and was parked.
- ·Bulk export ships as one ZIP per selected set of transcripts
- ·The pagination reset is a P0 and goes first
- ·Status changes made in Linear sync back into Spectr
- ·The onboarding rewrite stays out of this quarter
Scope the ZIP export for a whole set of transcripts
Reproduce the pagination reset on filter change
Circulate the notes and confirm the sprint's three items
Decide whether the onboarding rewrite waits for Q1
Stories generated from this spec sheet
Review stories →Bulk export for meeting transcripts
Export a selected set of transcripts as one ZIP, and keep finished exports in the workspace's own storage bucket.
Pagination resets on filter change
Changing a filter on the stories list sends the reviewer back to the first page mid-review.
Linear webhook bidirectional sync
Pick up status moves made in Linear so the two tools stay in sync without re-entry.
Onboarding flow rewrite
Raised again and parked in the meeting: explicitly out of scope for this quarter.
Scope that stays current, version by version.
Create a living BRD or PRD from pasted text, an uploaded file, or your meetings. Tag a version when scope is agreed - the latest tagged version is automatically injected into every spec sheet Spectr generates.
API Platform - Product Requirements
- Added bulk export of meeting transcripts, one ZIP per selected set
- Linear status changes now sync back through the webhook within a minute
- Moved the onboarding rewrite out of scope, deferred to next quarter
- API keys per workspace, each with read and write scopes
- Rate limits of 600 requests a minute per key, answered with 429 and Retry-After
- Docs site generated from the OpenAPI spec on every release
Reference files (0/5)
PDF · TXT · MD · JPEG · PNG · up to 5
What ships when, planned from your requirements.
Spectr reads every requirement in the project and plans milestones and epics, dated from your team's real pace and what is already done in the tracker. Every story is filed under an epic, each bar fills as its stories finish in Linear, Jira or Shortcut, and Update with AI re-plans when the requirements change - as suggestions you review.
Product Delivery
Roadmap
TargetSep 30, 2026 from the requirements: "The developer portal goes live before the partner launch at the end of September."
- Done
- In progress
- To do
- Today
- Target Sep 30, 2026
Keys and accessJun 1 - Jun 26, 2026
API keys and scopes
Complete · 24 of 24 done
Rate limits and quotas
Complete · 18 of 18 done
Webhooks and syncJun 15 - Jul 24, 2026
Webhook delivery and retries
14 of 22 done · 4 in progress
Linear sync
3 of 9 done · 2 in progress
Pagination and filters
6 of 8 done · 1 in progress
Exports and archivesJul 27 - Aug 21, 2026
Transcript exports
1 of 12 done · 1 in progress
Storage and retention
0 of 9 done
Developer portalAug 24 - Sep 25, 2026
Docs site
0 of 34 done
Portal onboarding
0 of 22 done
Usage dashboard
0 of 18 done
Milestones and epics
Show archived epics4 stories aren't filed under an epic yet. Open a story to choose its epic.
Milestone 1
Keys and access
Jun 1, 2026 - Jun 26, 2026
API keys with scopes, per-key rate limits and quotas. Every endpoint after this depends on them.
Milestone 2
Webhooks and sync
Jun 15, 2026 - Jul 24, 2026
Outbound webhooks with signed, retried deliveries, and the two-way Linear sync agreed on the Q4 Planning Call.
Linear syncStory statuses follow Linear both ways through its webhooks, with the last sync shown on each story. From the Q4 Planning Call.3 of 9 done · 2 in progress
- Map Linear workflow states to story statusesDone
- Verify Linear webhook signaturesDone
- Backfill issue links for stories published before syncDone
- Retry failed Linear webhook deliveries with backoffIn progress
- Show the last sync time on each published storyIn progress
- Sync assignee changes from LinearTo do
- Sync label changes from LinearTo do
- Handle issues moved between Linear teamsApproved
- Linear webhook bidirectional syncPending review
- Poll Linear when webhooks are turned offCanceled
Milestone 3
Exports and archives
Jul 27, 2026 - Aug 21, 2026
Bulk transcript exports and archives kept in the workspace's own storage bucket.
Milestone 4
Developer portal
Aug 24, 2026 - Sep 25, 2026
The public docs site, self-serve onboarding and a usage dashboard for every key.
Catch scope creep before it derails the sprint.
Spectr flags out-of-scope work the moment it surfaces - in a meeting, a requirement, or a story - and tracks every exclusion through its lifecycle. Confirm it, defer it to a future phase, dismiss a false positive, or approve it back into scope. Linked stories update automatically.
Scope Creep Tracker
Onboarding flow rewrite
Raised again in the Q4 Planning Call and parked - not this quarter.
Linked stories (1)
History
Flagged as out of scope from Q4 Planning Call
Jun 26, 2026 - 03:12 PM · 91% confidence
Linked story Rewrite the onboarding flow end to end
Jun 26, 2026 - 03:14 PM · JLJordan Lee
SSO via Okta / SAML
Enterprise-only requirement - parked for a later phase.
Bulk CSV import of historical data
Confirmed out of scope for launch - API-based import deferred.
Offline mode for the mobile app
Raised by the mobile team, but out of the Q4 launch scope.
Custom report builder
Flagged by AI, but it's actually covered by the agreed spec.
Page 1 of 1
Know exactly where every project's budget stands.
Connect Harvest and every project's budget and spend lands in Spectr - budgeted versus spent versus remaining, with on-track, near-limit, and over-budget health at a glance. Add Forecast and each project also shows per-member allocation and logged hours right beside the budget.
Budget
Apr 1, 2026 → Dec 18, 2026
Hourly rate
CA$150/h
Total budget
CA$78,000
Remaining budget
CA$27,471
Projected budget
Used so far
Still to come
Meetings and misc work have used CA$13,950 so far against a CA$15,600 estimate.
38 stories completed (412h) · counted in Spent
12 stories unapproved (96h)
9 stories rejected (54h)·3 stories out-of-scope (22h)Scope Creep tracker
Jordan Lee
Sam Rivera
Taylor Chen
Finance
Not tracked yet - connect Harvest to see this project's budget.
No budget is configured for this project in Harvest.
Every project's team, assembled automatically.
Spectr pulls each project's members from Linear, Shortcut, Harvest, and Forecast, then AI-fills every person's role - so new stories route straight to the right owner, and you can put any teammate on a story or task.
Team
Project roles
What each team member works on - used to route stories to the right person.
- JLJordan LeeWorkspace memberProject ManagerAI
jordan@acme.com
Change role
HarvestProject ManagerLinearAdmin
Forecast - AKAlex KimWorkspace memberEngineering LeadAI
alex@acme.com
Change roleLinearAdmin
- SRSam RiveraExternalBackend EngineerAI
sam@acme-partners.com
Change role
HarvestMemberLinearAdmin
- TCTaylor ChenWorkspace memberProduct DesignerAI
taylor@acme.com
Change role
HarvestProject ManagerLinearAdmin
Forecast - MCMaya ChenExternalProduct OwnerAI
maya@acme-partners.com
Change roleLinearMember
- FIFinanceExternalStakeholderAI
finance@acme.com
Change role
HarvestProject Manager
Forecast
Team allocation
Scheduled hours per person from Forecast, by week.
Jordan Lee
Taylor Chen
Finance
Chat with your whole project - and see how it got there.
Ask the AI Assistant anything in plain language. It searches across your projects, meetings, spec sheets, requirements, stories, the delivery roadmap, Development workstreams, AI Memory, budget, team, and scope-creep - showing its reasoning and every source it checked, each linked. Scope a chat to one project or the whole workspace, pick your model, and keep it private or share it with your team.
Who's on the API Platform team?

The chat is bound to API Platform, so I'll pull that project's team roster and merge each member's integration sources.
Here's the team on API Platform (the project bound to this conversation):
| Name | Workspace role | Sources |
|---|---|---|
| Jordan Lee | Admin | Harvest · Linear · Forecast |
| Alex Kim | Member | Linear |
| Sam Rivera | - | Harvest · Linear |
| Taylor Chen | Admin | Harvest · Linear · Forecast |
| Maya Chen | - | Linear |
| Finance | - | Harvest · Forecast |
Synced from Linear (5 members) and Harvest (4); Forecast is connected for 3 of them. Want me to pull their logged-hours stats, or the open stories assigned to any of them?
Sonnet 5.5
Ask Spectr…
Dashboard
Action items
Scope the ZIP export for a whole set of transcripts
Reproduce the pagination reset on filter change
Circulate the notes and confirm the sprint's three items
Confirm the Linear webhook scope with the platform team before the sprint starts
Send the archiving requirement to Finance for sign-off
Decide whether the onboarding rewrite waits for Q1
Plan usage
Spec sheets generated
16/ 25
Spec sheet AI tokens
1.7M/ 2.0M
Active members
4/ 5
Requirement revisions
6/ 25
Requirement AI tokens
900.0K/ 4.0M
Delivery revisions
4/ 25
AI Assistant tokens
115.8K/ 10.0M
Overall stats
Requirements
9
Spec sheets
24
Meetings
41
Out-of-scope items
5
Stories by status · 500
- Pending138663 pts
- Approved1444 pts
- Rejected131396 pts
- Published217458 pts
Projects by budget status
- On track2
- Near limit1
- Over budget1
2 projects without budget tracking
Projects
The public API and developer portal - keys, rate limits, webhooks, and the docs site.
Rebuilding the iOS and Android shells on one design system, starting with onboarding.
Self-serve billing, seat management, and the support inbox customers actually see.
Shared reporting for resellers, scoped to whatever each partner is allowed to see.
Moving invoicing and dunning off the legacy processor without a billing outage.
The shared component library the web app and the mobile shells both build on.
Integrations
Import meeting transcripts manually from your Fathom account
Import meeting notes and transcripts from Granola
Import meeting transcripts and summaries from Read.ai
Import meeting transcripts, summaries and action items from Fireflies.ai
Read design comments and file context
Link repositories to projects for issue and PR context
Connect Notion pages for requirements context
Docs, Sheets & Slides for requirements context
Publish approved stories to Shortcut teams
Publish approved stories to Linear teams
Story defaults - Project: API Platform · State: Backlog
Publish approved stories to JIRA Cloud projects
Track a project’s budget and spend (read-only) from Harvest
Track each team member’s scheduled hours (read-only) from Forecast
Track errors, user feedback, and feature rollouts (read-only) from PostHog
Track unresolved errors and their trend (read-only) from Sentry
AI ProductOps for the entire team.
Start for free at spectr.pm- Free plan
- No credit card to sign up
- 30-day free trial on Starter
- First 3 months free on any plan